Case Studies


Works Undertaken in 2013/14 for a Leading Pharmaceutical Company- Capital Projects

Works for a World Leading Pharmaceutical Company- Building Fire Separation Upgrade Project

SWI Ltd Principle Contractor

Project Value - £8m
Project Period – October 2012 – September 2015. Approx 36 Months.
Operatives for the Project – Commercial Manager, Quantity Surveyor, Project Manager, Project Engineer, Site Manager + 30 No Operatives.
Project Description - The existing fire alarm system at Ware in the majority of the buildings is an old system that will not be supported by the end of 2012.  This project will involve the phased replacement of the old system with a new open protocol system that will be compliant with BS 5839.  The new system will have an automatic voice announcement capability. The project also includes the install of new LV distribution and upgrade of the fire separation within the buildings.

Builders Work Disciplines Include -

Upgrade of the fire dampers within the HVAC systems.
Upgrade of all fire doors.
Fire stopping to all designated fire separation of the buildings.
Building 5 office areas glass partition upgrade.

 


 

Works for a World Leading Pharmaceutical Company - Smart Office Upgrade

SWI Ltd Electrical Contractor

Project Value - £200K
Project Period – December 2013 – May 2014.
Operatives for the Project – Commercial Manager, Project Manager, Site Manager + 10 No Operatives.
Project Description – To strip out the redundant electrical systems back to the point of distribution. To install smart office lighting and power to the electrical consultants design. This included the installation of Philips Lighting LED luminaries and control system.

 


 

Works for a World Leading Pharmaceutical Company - Fire Damper Upgrade Project.

SWI Ltd Mechanical Contractor

Project Value - £2.2m
Project Period – January 2013 – December 2014.
Operatives for the Project – Commercial Manager, Project Manager, Site Manager + 4 No Operatives.
Project Description – The strip out of redundant, the installation of new and the servicing of existing fire dampers within the HVAC systems.

 


 

Works for a World Leading Pharmaceutical Company - FA/PA/VA Upgrade Project.

SWI Ltd Electrical Contractor

Project Value - £130k
Project Period – July 2013 – December 2013.
Operatives for the Project – Commercial Manager, Project Manager, Site Manager + 8 No Operatives.
Project Description – To install fire rated cables for the new Fire Alarm, Public Address and Voice Address system. To install new LV distribution to fire alarm systems.

 


 

Small Works Projects Completed For JCI in 2013/14

Addenbrookes Hospital Change Over Switch Replacement.
SWI Ltd installed generator and temp power supply to all essential freezers and equipment to allow ABB to complete the changeover switch replacement.

 


 

Harlow Load Bank Testing Project H89 H92 & H97
SWI Ltd installed bespoke load bank connection panels and associated cabling to 3 generators at Harlow. This allowed JCI and Dale Power to safely complete periodic load bank testing.

 


 

Works for a World Leading Pharmaceutical Company - Roof Extract Fan Electrical Remedial Works
SWI Ltd carried out emergency renewal of cable and controls to a burnt out essential fumes extract fan.

 


 

Works for a World Leading Pharmaceutical Company - Secondary Packaging Lighting Energy Reduction Project
SWI Ltd Installed Philips Occuswitch PIR sensors to existing luminaires to reduce the lighting power consumption in that area.

About Company

SWI has developed a very close and mutually beneficial relationship with the worlds largest pharmaceutical company. This has allowed SWI to develop high quality testing and inspection procedures, enabling the highest standards of service throughout the installation schedule.

Terms of Use
Privacy Policy
Cookies

Our Standards

We are a full member of the National Inspection Council for Electrical Installation Contractors - N.I.C.E.I.C. It's the industry standards body and they inspect us very thoroughly every year, so you can be sure that every job we do is to the highest standards. Click here to read more about our H&S Policies.

Current Projects

Fire Alarm Replacement and Fire Compartmentation Upgrade Works at World Leading Pharmaceutical Company

This project also incorporated the upgrade of all the fire barriers within the buildings including, HVAC fire dampers service or replacements, fire stopping of compartment walls, upgrade and sign off of all fire doors, Installation of upgraded fire protection glazed partitioning.